logo
Area 3, block B, huafeng huayuan science&technology innovation park, bao'an district, shenzhen, guangdong, china
English
Home ProductsPTC Water Heater

Long Leads Liquid Ceramic Resistor Heater PTC Environmental Protection

Long Leads Liquid Ceramic Resistor Heater PTC Environmental Protection

  • Long Leads Liquid Ceramic Resistor Heater PTC Environmental Protection
Long Leads Liquid Ceramic Resistor Heater PTC Environmental Protection
Product Details:
Place of Origin: China
Brand Name: Hwalon
Certification: CE/RoHS/CE/VDE
Model Number: PR4
Payment & Shipping Terms:
Minimum Order Quantity: 100pcs
Price: negotiation
Packaging Details: Standard CTN package or according to customer’s requirement
Delivery Time: 25 working days after received your payment
Payment Terms: T/T, Western Union
Supply Ability: 10,000pcs per month
Contact Now
Detailed Product Description
Lead Dia.: Customized Strong Point: Can Be Used In Water
Power: 20W~2000W Operating Voltage: 6V~240V
Surface Temp.: 80℃~290℃ Insulation Voltage: > 3750V
Highlight:

PTC Water Heating Element

,

Ceramic Water Heater

Long Leads Liquid Ceramic Resistor Heater PTC Environmental Protection

 

 

Feature
1. With charcteristics of constant temperature
2. PTC hearter does not require temperature controlling system
3. It is safe when liquid is burnt out in liquid heating device
4. Not sensitive to voltage fluctuating
5. Wide operating voltage
6. Restore automatically after invalidation

 

 

How to Order:

In order to help you to get the exact model, please offer the following necessary info.:

1.Application of the PTC Heater pills:__________

2.Size of the PTC Heater pills:__________mm

3.Environment Tempeture:________ °c

4.Surface electrode : Silver or Aluminium

5.R value(25 °c):_____ ohm ±________%

6.Surfact Tempeture: ________ °c

7.Operating Voltage: ________ V

* Fill " * " items necessarily

 

 

Description:

1. submerged liquid heater application design

This is a submerged liquid heating (T-type PTC heater), the heater probe into the liquid container is heated, the liquid to obtain a constant temperature. PTC element used as the heat source, with fast heating, heat thermostat, self-adjusting power, heat conversion rate, anti-scale ability, even if no damage and so dry. It is widely used in various types of electric appliances in the home appliance industry.

Embedded liquid heater technology parameters:

Operating voltage: 6V-240V

Insulation voltage:> 3750V, through special insulation treatment, safe and reliable

Surface temperature: 100 ℃ ~ 290 ℃

Rated power: 20W ~ 800W

2. fluid liquid heater application design

     This is a fluid liquid heater (also called foot tub with a tubular heater PTC), our company is for the foot bath product launch another product, mainly used in high-end to the cycle of heating foot bath products above, with the use of easy installation, long life, easily damaged and other traditional heating materials (for example: quartz glass) unmatched features. Further dimensions can be customized to customer's actual installation size, product quality in a leading position in the peer.

Fluid liquid heater technical parameters:

Operating voltage: 6V-240V

Insulation voltage:> 3750V, through special insulation treatment, safe and reliable

Surface temperature: 80 ℃ ~ 290 ℃

Rated power: 20W ~ 2000W

 

 

Applications:

 

Application  Foot tub, home appliance industry of electric appliances 

 

 

Competitive Advantage:

1. Leak-proof, excellent insulating property 

2. High power

3. Safety and reliability 

4. OEM for your design

5. Stable performance

 

 

Specifications:

 

  Operating voltage Insulation voltage Surface temperature Rated power
Embedded liquid heater 6V-240V > 3750V 100 ℃ ~ 290 ℃ 20W ~ 800W
Fluid liquid heater 6V-240V > 3750V 80 ℃ ~ 290 ℃ 20W ~ 2000W
 

 

 

Home Appliance Equipment PTC Water Heater with Long Leads Design

 

Long Leads Liquid Ceramic Resistor Heater PTC Environmental Protection 0

 

Any question occurred,please do not hesitate to get in touch with us.We will surely help you heart and soul.

 

We are looking forward to establishing long-term friendly business relationship with you.

 

 

 

 

Contact Details
Shenzhen Hwalon Electronic Co., Ltd.

Contact Person: Amy

Tel: 18520896931

Fax: 86-755

Send your inquiry directly to us (0 / 3000)

Other Products